Project Logs
Home Project Logs Project Pictures My Experiences Hover Videos Hoverware

Disclaimer: Please Take Notice
My craft has been highly modified from the original plan and design.  Many of my modifications, especially the GEO installation, were strongly opposed by Barry Palmer of Sevtec.  Barry sent me several email messages with the subject of "GEO not a good Idea" trying to convince me not to convert to this engine.  As you will see, I implemented these changes anyway at my own risk.  Be aware that neither myself, nor the designer, holds any responsibility to any changes, modifications or design alterations you make to your craft based on the information provided in this site.
Good luck, build safe and above all
Happy Hovering!

Title & Registration:  May 17, 2000  FL 5981 LG

Vessel Name:   "Blew-By-U"

Construction Time:  As of May 28, 2000
376.75 hours

Construction costs (up to first maiden voyage):
Approximately - $3500.00

Construction Time:  As of September 21, 2000
439.00 hours

Construction costs (including GEO installation):
Approiximately - $4480.00

Construction Logs
The following pages provide the day by day construction sequence with actual working hours.

Hull Panel I.D.

  This page shows you the location of each of the hull panels mentioned in the Logs.

Materials List

List of Costs and Materials.  This list is covers 98% of the materials used.

Const Log 1-Main Hull-Part 1

  Initial foam layout, cutting & glassing.

Const Log 2-Main Hull-Part 2

  Assembly of the main hull panels & deck stringers.

Const Log 3-Main Hull-Part 3

  Assembly of the rear engine deck & rear quarter panels.

Const Log 4-Main Hull-Part 4

  Glassing the hull bottom, finishing the interior glasswork & deck framing.

Const Log 5- Main Hull-Part 5

  Finishing out the deck and hull interior.

Const Log 6-Engine & Fan-Kohler

  Assembly of engine/fan mount, rudders, & prop guard.

Const Log 7-Skirt

 Installation of the skirt.

Const Log 8-Electrical System

  The Electrical system & other final installations.

Const Log 9-The Last Phase

  The Maiden Voyage First Flight - May 30, 2000

Const Log 10-Upgrades and Mods

  GEO installation and the new steering control system. Completed 09-21-00